Flowserve EV 30 User Manual

Browse online or download User Manual for Hardware Flowserve EV 30. Flowserve EV 30 User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
1
EV 30
Installation Instructions 810496-00
Bottom Loading and Unloading System EV 30
Page view 0
1 2 3 4 5 6 ... 23 24

Summary of Contents

Page 1

1EV 30Installation Instructions 810496-00Bottom Loading and Unloading System EV 30

Page 2

10ContentsSafety note...11Danger ...

Page 3 - Dimensions

11Important NotesSafety NoteUse bottom loading system EV 30 only for loading and unloading tanks designedfor transporting products which are liquid at

Page 4 - Functional elements

12Explanatory NotesSystem DescriptionThe bottom loading system EV 30 consists of EV 30 DN 125 mm type F for liquidphase and EV 30 DN 80 mm type G for

Page 5

13DesignEV 30 DN 125 mm type F Bottom valve UV 70 for DN 125 and 150 mm Valve mounting flange EV 30 for DN 150 mm Operating mechanism BV 50 DN 125/150

Page 6

14MaterialsEV 30 DN 125 mm type FStandard design Austenitic designValve mounting flange 1.0425 H II 1.4571 X6CrNiMoTi 1712 2UV 70, DN 125 mmValve disc

Page 7

15InstallationToolsFor installation and maintenance work use tools commonly used by fitters andmechanics.Dimensions and component parts see Fig. 1 – 4

Page 8

16Bottom Valve with Operating Mechanism – continued –See Fig. 57. Attach support to operating mechanism by using a pin.8. Position base p

Page 9 - OPEN and CLOSED

17see Fig. 41. Weld support from inside into the tank top, taking spacing specifications(59 ± 2) into account. The support is not part of the GEST

Page 10 - Contents

18Vent valve and standpipe (internal gas balance pipe) – continued –10.Use operating rod to open the vent valve . Fix it in place by inserting

Page 11 - Important Notes

19See Fig. 2, 4, 61. Loosen connecting rod (linked with and ) from bottom valve.2. Unscrew fixing bolts of bayonet base cap . Pull bayon

Page 13 - CLOSED 700 N

20Bottom Valve: Replacing Gasket – continued –Operating Mechanism: Retightening Stuffing Box12.Remove fixing pin from the hole and close the bott

Page 14 - EV 30 DN 80 mm type G

21AttentionNote that the bayonet base cap is spring loaded.– Spring force when spring is mounted: 140 N– Length of unloaded spring : 157 mm

Page 15 - Installation

22OperationOpening the loading and unloading system EV 30See Fig. 1, 3, 51. Turn locking hook clockwise upwards to unlock the hand lever .2. Af

Page 17

24GESTRA Gesellschaften · GESTRA Companies · Sociétés GESTRA · Sociedades Gestra · Società GESTRAVertretungen weltweit · Agencies all over the world ·

Page 18

3Fig. 1Dimensions

Page 19 - Maintenance

4Functional elementsHGFEB4B3DCBAB1Lever at limit stop* welded directly intotank shell** boiler port withvalve-mounting flangeIJB1LRMNN1KFig.

Page 20

5InstallationFig. 4Not part of theGESTRA consignmentGFXWVUTSRQPO

Page 21

6InstallationLLLL1A4A2A7A1A5LR1LRMN1N KA6A1B1BA2Fig. 5Pipe 42.4 x 5.6 to DIN 2448,carbon steelPipe 42.4 x 5.6 to DIN 2448,carbon steel

Page 22 - Operation

7MaintenanceB2D1R1OYZD3D2Fig. 6Fig. 7

Page 23

8MaintenanceG3G4GG2TUG8G7G9G10G6G5Fig. 8Fig. 9

Page 24 - GESTRA GmbH

9Manual operating mechanism EV 30Operating mechanism BV 50, DN 150 mmValve mounting flange, DN 125/150 mmBottom valve UV 70, DN 125 mmActuating rod as

Comments to this Manuals

No comments