FCD-DVENIM0400-00 Installation, Operation, and Maintenance Breaking the Barriers Flowserve TX2 Tr
Flow Control Division 10 11.5 Insta
Flow Control Division 11 SECTION XII CHANGE OF DISC AND BODY SEAT 12.1 To facilitate reassembly, mark the positon of the operator, yoke and body
Flow Control Division 12 12.8 Loosen all bolts from body seat by hexagonal wrench. 12.9 Remove the body seat and gasket (seal-4) in sequence. 12.10
Flow Control Division 13 12.14 Please refer to Fig.19 for putting new gasket (seal-3) into the disc groove.
Flow Control Division 14 SECTION XIII CHANGE OF GASKET 13.1 Loosen and remove the bolts from the body bottom cover and take off the bottom cover a
Flow Control Division 15 14.1.6. Position the seal o-ring on the disc, then place the seal ring onto the disc with the larger diameter of the out
Flow Control Division 16 SECTION XV PARTS AND SERVICE 15.1. Parts and service kits for most valve components are readily available. For parts or
Flow Control Division 17 SECTION XVI TROUBLESHOOTING GUIDE In the event of valve difficulties you may try the following procedures before contacti
Flow Control Division 18 SECTION XVII CAUTIONS 17.1. Application: 17.1.1. The valves are not suitable for a flows containing metal chips, which c
Flow Control Division 19 17.3. On Service: 17.3.1 Do not touch the valve body when it is on service. 17.3.2 Do not loosen flange bolts, valve bo
Flow Control Division 2 TABLE OF CONTENTS SECTION TITLE PAGE FOREWORD 2 I THEORY OF OPERATION 3 II PRELIMINARY PRECAUTIONS 3 III INSPECTION
Flow Control Division 20 17.1 Maintenance 17.4.1 Maintenance personnel should be trained before doing the repair. 17.4.2. Do not replace the gas
Flow Control Division 21 SECTION XVIII PARTS LIST AND MARKINGS Parts for Wafer and Lug Designs
Flow Control Division 22 Parts List for Wafer and Lug Designs No. Name Materials Spare parts No. Name Materials Spare parts 1 BODY A216 Gr. WCB
Flow Control Division 23 Parts for Flanged Designs
Flow Control Division 24 Parts List for Flanged Designs No. Name Materials Spare parts No. Name Materials Spare parts 1 BODY A216 Gr. WCB 15
Flow Control Division 25 Fig.23 Each valve will b
Flow Control Division 26 Printed in U.S.A. July 2010 © Flowserve Corporation Flowserve Pte. Ltd. 12 Tuas Avenue 20 Republic of Singapore 638824 Pho
Flow Control Division 3 SECTION I THEORY OF OPERATION The valve design is based on a double eccentric geometry of the disc rotating center, utiliz
Flow Control Division 4 SECTION III INSPECTION 1. Before installation of the valve into the piping system, visually inspect the valve to determi
Flow Control Division 5 SECTION V STORAGE When the valve is not put into immediate service, it is required that the valve be stored in a heated bui
Flow Control Division 6 4.5. Install valve and gaskets into pipeline as (Fig.5). Fig 5
Flow Control Division 7 SECTION VIII FLANGE CONNECTING & BOLTING 8.1. Keep valve protection boards until installation. 8.2. Make sure the mater
Flow Control Division 8 SECTION IX REMOVAL PROCEDURE To remove your valve from the pipeline, please follow these simple steps: Ensure that the va
Flow Control Division 9 11.2 Remove all of the packing in the stuffing box using a flexible screw hook. For stuffing boxes that contain a lantern